New Requirements, its Development, Testing and Release Status-Development Period : 01.12.2017 to 21.12.2017
New Requirements, its Development, Testing and Release Status –
Development Period : 01.12.2017 to 21.12.2017
S.No Point under consideration Module Status Pending at Remarks
Development Points
1 Facility to view Index II and Scanned Documents (earlier, Scanned documents development was pending at iSarita end) eFerfar Released Works on SDC Servers, for BSNL Server, SDC-BSNL – Port opening issue Follow-up is from NIC Server Team
2 Map – 7/12 Web Service – to provide count of land owners on 7/12 Map Web Service Released Hosted on Mahabhulekh Servers
3 Facility to delete History Mutation numbers eFerfar Released
4 Login for all SDOs in the State for eFerfarMIS eFerfarMIS Released
5 New mojani type – Very Very Urgent for Agri Lands eMojni Released
6 Prakhyapan Changes in Declaration III in Re-Edit for Date column and count of survey numbers Re-Edit Released
7 Facility for DDE to be promoted, demoted User Creation Released As per requirement submitted by Gondia
8 7/12 Header to repeat on each page All modules Given to SCO Team for checking Feedback awaited
9 OCU separated as OCU (current year) and OCU_BACKLOG (for past years) OCU Released
10 MIS extension to village level eFerfarMIS Released
11 Handling of large number of survey numbers of Registered documents example : 350 Survey as observed in Shrivardhan eFerfarMIS Released Facility to save in multiple sessions and saving survey wise provided. Earlier it was to be saved in one go which caused problems in saving
12 New Development of “Mayatache naav kami karne” Template as per new Waras flow eFerfar Released
13 Change of restricted tenure type eFerfar Released
14 In Non Reg Kharedi template, disable naave area and potkharaba eFerfar Released
15 Handling of Declaration-I reversion and associated data vis-à-vis Ferfar Register Re-Edit Released
16 Showing of AaPaKa on single row as discrepancy Re-Edit Released Check put in Declaration-1
17 SAHAKARI BANK as MASTER in Other Rights State Coordinator to finalize master code with STD, NLRMP
18 Re-arrangement of menu options for Talathi & Circle Officer eFerfar In Ahwal, sub options used to grow very large this is now rearranged in proper sub menus
Issue Fixes
1 Putting of Point in Time names of talathi, circle, DBA and Tahsildar in all reports of Re-Edit instead of current officers Re-Edit Released
2 During Waras mutation, if one of the survey of deceased was found to be blocked in Ahwal 5, 7 – the message was not seen to user and user was not able to go ahead eFerfar Released Alert is now properly shown to user that on which survey it was blocked
3 Very large other rights entries handling on screen for check box selection of mutation number Re-Edit Given for UAT to Pune in Test site Fixed
4 Tenure-1 sub master, if selected by mistake, then provision is given to unselect that after circle rejection Re-Edit Released Fixed
5 Gahan Khat Re-entry used to generate new mutation number eFerfar Released Fixed
6 Gahan Khat re-entry was stopped due to self check of current document number eFerfar Released Fixed
7 SRO Document, if buyer area coming from SRO is zero, it is provided for delete so that new entry can be taken from Non Reg mode eFerfar Released The deal and other effects used to be wrong due to no area assigned to buyer, Matter taken with IGRO by SCO
8 If 2 documents were registered for same survey, the software could not earlier process these documents due to deadlock situation eFerfar Released Fixed as per FIFO (First In First Out – i.e. smaller document number is allowed for processing first now).
Comments