रामदास जगताप ( Ramdas Jagtap )


उपजिल्हाधिकारी, PMRDA,पुणे.

Mutation Permissions on Different land tenures


             Mutation Permissions on Different land tenures

        Chart Showing Permissions and Facilities for taking mutation on different land tenures
Case - ID
Tenure Type with additional positions
Is Permission Required ?, if so, from whom
Is request   initiated by talathi ?, if not how permission is granted
Types of mutation allowed
Facilities for taking a  mutation entry
Additional Information
Remarks of SC Office, if any
1
Tenure-I
Without sub type
Without Ahwal-I cases 
No permission is required
No
All mutation types are allowed.
 Tabs are open specific to mutation type

[A]
No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri Land to NA
[B]
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All tabs are open

2
Tenure I with out sub type with out Ahwal III N Times


                                                                     --- SAME AS ABOVE ---

3
Tenure-I
Without sub type with
 Ahwal-I cases without N Times
No permission is required
No
All mutation types are allowed.
 Tabs are open specific to mutation type

[A]
No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Non NA to NA
[B]
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All tabs are open

4
Tenure-I
Without sub type with
 Ahwal-I    N Times
No permission is required
No
No mutation types are allowed.
 Only Sec-155 Ahwal-1 Durusti,  KDM  are allowed


[A]
 Change of Area – can   increase or decrease area from existing values   but for clearing Ahwal-I

[B]
Ahwal-I is to be cleared. Entry is not saved till both area of VF VII and sum of all khatedars do not match



5
Tenure I with out sub type with  Ahwal III  N Times
No permission is required
No
No mutation of any type is allowed till discrepancy is corrected as mentioned in next column
Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.


No mutations can be taken till ODC corrections

6
Tenure-I
With sub type
Without Ahwal-I cases 
Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
All mutation types are allowed

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri. to NA .
From Sec 155 Ahwal-I Durusti or KDM  mutation can be taken.
All mutations can be taken with Tahsildar Permission
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar



7
Tenure I with sub type   wIth  Ahwal-I     N Times
Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
No mutation types are allowed.
 Only Sec-155 Ahwal-1 Durusti,  KDM  are allowed.


[A]
 Change of Area – can   increase or decrease area from existing values   but for clearing Ahwal-I

[B]

Ahwal-I is to be cleared. Entry is not saved till both area of VF VII and sum of all khatedars do not match.




8
Tenure I with   sub type with  Ahwal III  N Times
Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
No mutation of any type is allowed till discrepancy is corrected as mentioned in next column
Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.


No mutations can be taken till ODC corrections

9
Tenure-I
With sub type
With  Ahwal-I   without N Times
Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
All mutation types are allowed

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri. to NA

For Ahwal-I Correction,
Sec 155 Ahwal-I Durusti or KDM  mutation can be taken
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)


All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar


10
Tenure I with   sub type with out Ahwal III  N Times


                                                   -------   SAME AS ABOVE    ---------------
For Ahwal-III correction, Talathi has to initiate correction in ODC and Tahsildar has to approve in UC

11
Tenure-II
Without Ahwal-I   

Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
All mutation types are allowed

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri. to NA

All mutation types are allowed

Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar.



12
Tenure-II
 With Ahwal-I   without N Times

Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
All mutation types are allowed

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri. to NA

For Ahwal-I Correction,
Sec 155 Ahwal-I Durusti or KDM  mutation can be taken
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar



13
Tenure II with out Ahwal III  N Times
Tenure II Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
All mutation types are allowed after tenure permission is obtained
Correction of Ahwal-III : Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.


No mutations can be taken till ODC corrections

14
Tenure II with sub type and  wIth  Ahwal-I     N Times
Blocked for all mutations except for mutations : Sec 155 Ahwal-I Durusti or KDM  mutation can only be taken
Tahsildar will release the survey numbers after  which talathi can  take mutation in eFerfar
Sec 155 Ahwal-I Durusti or KDM  mutation can only be taken
No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc
Can not transfer Agri. to NA

For Ahwal-I Correction,
Sec 155 Ahwal-I Durusti or KDM  mutation can be taken
Ahwal-I is to be cleared. Entry is not saved till both area oif VF VII and sum of all khatedars do not match


15
Tenure II with Ahwal III  N Times
Tenure II Permission is required from Tahsildar for taking a mutation (each mutation requires new permission)
No ,
From UC  module  by Tahsildar
No mutation of any type is allowed till discrepancy is corrected as mentioned in next column
Correction of Ahwal-III :
Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.


No mutations can be taken till ODC corrections

16
Tenure-III and Tenure IV

(Sarkar and Sarkari Pattedar)

Without Ahwal-I cases 

Tahsildar grants permission for taking one mutation

Tahsildar uploads the ORDER of competent authority on taking one mutation on the survey number
No ,
From UC  module  by Tahsildar on his own
Only aadesh va dastavej

Also as part of aadesh va dastavej, additoanl mutation facilities like new 7/12, close 7/12, change survey number can be taken

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc

Can not transfer Agri. to NA
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar





17
Tenure-III and Tenure IV

(Sarkar and Sarkari Pattedar)
 wIth  Ahwal-I cases without N Times

Tahsildar grants permission for taking one mutation

Tahsildar uploads the ORDER of competent authority on taking one mutation on the survey number
No ,
From UC  module  by Tahsildar on his own
Only aadesh va dastavej

Also as part of aadesh va dastavej, additoanl mutation facilities like new 7/12, close 7/12, change survey number can be taken

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc

Can not transfer Agri. to NA
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)

All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar

For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet




18
Tenure III and IV with out Ahwal III  N Times
Tahsildar grants permission for taking one mutation

Tahsildar uploads the ORDER of competent authority on taking one mutation on the survey number
No ,
From UC  module  by Tahsildar on his own
Only aadesh va dastavej

Also as part of aadesh va dastavej, additoanl mutation facilities like new 7/12, close 7/12, change survey number can be taken

No change of Area – can not increase or decrease area from existing values – only can assign area among jirayat, Bagayat..PotKharab etc

Can not transfer Agri. to NA

Correction of Ahwal-III :
Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.
Samanya Ferfar (Aadesh Va Dastavej, Itar Ferfar, New Survey Creation, Change Survey Number)


All Tabs are open

On mutation certification, the survey number is locked again for  taking any new mutation that means for each mutation permission is required from tahsildar

For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet


19
Tenure   III and IV wIth  Ahwal-I   with N Times
Blocked for all mutations 
Tahsildar will upload the mutation related order after which talathi can view the allowed survey numbers and take mutation in eFerfar


For Tenure-III and IV – Section – 155 mutations will be allowed for taking mutations (currently are not allowed)

For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet


20
Tenure III and IV with Ahwal III  N Times
Blocked for all mutations  till tenure permission is taken


Correction of Ahwal-III :
Talathi to initiate request for Alwal-III N Times correction from ODC and Tahsildar to approve from UC.

For Tenure-III and IV – Section – 155 mutations will be allowed for taking mutations (currently are not allowed)

For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet


21
Tenure I, II, III and IV wIth  Big Survey (Area > 20 H or 99 R) without any Ahwal Discrepancy
Blocked for all mutations till   Life Time permission is taken from Tahsildar.

-Life  time Permission by Tahsildar for Big Survey Relaxation which means before taking any mutation on a survey for any tenure type, one has to take permission for Big Survey and then for each mutation – required tenure permission are to be taken
Yes for Big Survey first,
Talathi will iniitate request from eFerfar and then Tahsildar will approve the same
from UC  module  
No mutation is allowed of any type till permission is taken



 After taking permission, for Tenure I  without sub type all mutations are allowed.

For Tenure-I with Sub Type and Tenure-II – respective permissions are required and then allowed mutation can be taken   as explained in above categories

For Govt Tenures (III and IV) – respective permissions are required and then allowed mutation  aadesh va dastavej  only

For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet


22
Tenure I, II  wIth  Big Survey (Area > 20 H or 99 R) with Ahwal-I Discrepancy
Blocked for all mutations till One Time (for each mutation)  permission is taken from Tahsildar.

- For every mutation,  Permission by Tahsildar for Big + Ahwal-I Survey number Relaxation is required which means before taking any mutation on a survey for any tenure type, one has to take permission for Big Survey + AhwalI   
Secondly,
for each mutation – required tenure permission are also to be taken
Yes for Big + Ahwal-I Survey. First,
Talathi will iniitate request from eFerfar and then Tahsildar will approve the same
from UC  module   for big + Ahwal-I permission

Then if tenure related permission is required it is also to be obtained
No mutation is allowed of any type till permission is taken



 After taking permission, for Tenure I  without sub type all mutations are allowed.

For Tenure-I with Sub Type and Tenure-II – respective permissions are required and then allowed mutation can be taken   as explained in above categories




23
Tenure III and IV  wIth  Big Survey (Area > 20 H or 99 R) with Ahwal-I Discrepancy
Blocked for all mutations till One Time (for each mutation)  permission is taken from Tahsildar.

- For every mutation,  Permission by Tahsildar for Big + Ahwal-I Survey number Relaxation is required which means before taking any mutation on a survey for any tenure type, one has to take permission for Big Survey + AhwalI   
Secondly,
for each mutation – required tenure permission are also to be taken
Yes for Big + Ahwal-I Survey. First,
Talathi will iniitate request from eFerfar and then Tahsildar will approve the same
from UC  module   for big + Ahwal-I permission

Then if tenure related permission is required it is also to be obtained
No mutation is allowed of any type till permission is taken

After permission only Aadesh va Dastavej mutation is allowed




For Govt Tenures (III and IV) – respective permissions are required and then allowed mutation  aadesh va dastavej  only



For Tenure III and IV - Sec 155 all mutations to be allowed – this development is to be completed yet



Note :
1)      All mutations are allowed as per their existing flow except   kharedi, boja kind mutation which are not allowed for Government  land tenures at all. For Government  land tenures, only mutations are allowed like Order - Aadesh va Dastavej, itar ferfar, Creation of new survey number, Change of Survey Number only. Section-155 mutations however, will be allowed for Govt land tenures (development to be taken up shortly)

2)      Mutations for corrections of Ahwal-1 Discrepancy Survey numbers  can be taken in 2 ways.
A]  For corrections of mistakes in computer record, they will done by Sec-155 Talathi Request – Tahsildar
      Approval – Parishist Generation flow.
B] Those survey numbers, which are having discrepancy in Revenue Record itself, such corrections will be
     through Order of competent by personal hearing for correction of Revenue Record – this order is to be uploaded.
     by Tahsildar and then Talathi will directly take mutation and will be certified by Circle Officer without
     going the Sec-155 path as shown in 1

Comments

Archive

Contact Form

Send